Status of MFC Sites (Position upto 08.06.2021)
|
S.No |
Site |
Division |
Zone |
State |
Date of Entrustment |
Area Entrusted in sqm |
Area Proposed to be Utilized in sqm |
Status
|
PIM |
AWARDED SITES |
|
1 |
Lokmanya Tilak Terminus |
Mumbai |
CR |
Maharashtra |
22.10.2010 |
1500 |
1500 |
Railway confirms that same MFC site is available IRSDC has been requested to share the development plan so that MFC work can be taken. |
PIM |
2 |
Miraj Jn |
Pune |
CR |
Maharashtra |
22.10.2010 |
7125 |
7125 |
Work in progress. |
|
3 |
Shegaon |
Bhusaval |
CR |
Maharashtra |
22.10.2010 |
1500 |
1500 |
MFC Completed and commissioned in Nov 2019 |
PIM |
4 |
Wardha |
Nagpur |
CR |
Maharashtra |
22.10.2010 |
1255 |
1255 |
Commissioned in July 2016. |
PIM |
5 |
Gaya |
Mughal Sarai |
ECR |
Bihar |
17.03.2011 |
2000 |
2000 |
MFC Completed and commissioned in Oct 2019 |
PIM |
6 |
Patna Saheb |
Danapur |
ECR |
Bihar |
22.10.2010 |
4365 |
4365 |
Commissioned in July 2019. Developer taken stay against Municipal Corporation Patna for sealing the building. |
PIM |
7 |
Raxaul Jn |
Samastipur |
ECR |
Bihar |
22.10.2010 |
2000 |
2000 |
Work in progress. |
PIM |
8 |
Jhansi |
Jhansi |
NCR |
Uttar Pradesh |
22.10.2011 |
2000 |
2000 |
Work almost completed but Developer has yet not applied for completion certificate. |
|
9 |
Katra |
Firozpur |
NR |
J & K |
|
9700 |
4500 |
Work Completed. |
|
10 |
Bareilly |
Moradabad |
NR |
Uttar Pradesh |
15.03.2011 |
1078 |
841.35 |
MFC Completed. |
PIM |
11 |
Abu Road |
Ajmer |
NWR |
Rajasthan |
17.11.2011 |
924 |
924 |
MFC completed/ commissioned in September, 2016. |
PIM |
12 |
Ajmer* |
Ajmer |
NWR |
Rajasthan |
20.01.2012 |
1302 |
1302 |
Completion drawings submitted. Some certificates awaited. Developer has filed a writ petition in High Court of Delhi to challenge RLDA letterd dated 25.01.2016,01.02.2016,11.03.2016 and 12.01.2017 for payment/invocation of BG. |
PIM |
13 |
Dhrmavaram (near Puttaparthi)* |
Guntakal |
SCR |
Andhra Pradesh |
22.10.2010 |
1080 |
1080 |
LOA to be cancelled. |
PIM |
14 |
Kacheguda |
Hyderabad |
SCR |
Telangana |
03.01.2013 |
1008 |
1008 |
Agreement signed on 01.02.2017.Work in progress. |
|
15 |
Karimnagar |
Secundrabad |
SCR |
Telangana
|
22.10.2010 |
1650 |
1650 |
LOA to be cancelled. |
PIM |
16 |
Nellore |
Vijayawada |
SCR |
Andhra Pradesh |
22.10.2010 |
450 |
450 |
Lease agreement signed. on 18.11.2016. Site is handed over to developer on 14.06.2018. |
PIM |
17 |
Nizamabad |
Hyderabad |
SCR |
Telangana |
22.10.2010 |
3750 |
3750 |
Agreement signed 08.02.2019.Site handed over to
Developer on 10.07.19 |
PIM |
18 |
Vijayawada |
Vijayawada |
SCR |
Andhra Pradesh |
22.10.2010 |
1857 |
1857 |
Lease Agreement signed on 09/05/2016. Work in progress. |
PIM |
19 |
Zahirabad (Medak) |
Secundrabad |
SCR |
Telangana |
22.10.2010 |
1606 |
1606 |
Lease Agreement is signed on 26.08.2016.Work almost completed. |
PIM |
20 |
Kasaragod |
Palghat |
SR |
Kerala |
15.03.2011 |
990 |
990 |
LOA to be cancelled. |
PIM |
21 |
Salem |
Salem |
SR |
Tamilnadu |
22.10.2010 |
975 |
975 |
MFC completed/ commissioned on 30.11.2015. Developer filed a write petition in High Court of Hyderabad to challenged the RLDA letter dated17.01.2018 to cure the payment default. |
PIM |
22 |
Tiruttani |
Chennai |
SR |
Tamilnadu |
22.10.2010 |
210 |
210 |
LOA to be cancelled. |
PIM |
23 |
Tumkur |
Bangalore |
SWR |
Karnataka |
20.01.2012 |
1593 |
1593 |
Work yet to be started. |
PIM |
24 |
Sawai-Madhopur Jn |
Kota |
WCR |
Rajasthan |
15.03.2011 |
5000 |
5000 |
MFC commissioned in February 2017. |
PIM |
25 |
Anand |
Vadodara |
WR |
Gujarat |
17.03.2011 |
1500 |
1500 |
Finishing work in progress. |
PIM |
26 |
Bhuj |
Ahmedabad |
WR |
Gujarat |
17.03.2011 |
1080 |
1080 |
MFC commissioned in Dec 2015. |
PIM |
27 |
Junagadh Jn. |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
1575 |
1575 |
Completed & commissioned in October,2017. |
PIM |
28 |
Ratlam |
Ratlam |
WR |
Madhya Pradesh |
14.05.2012 |
1350 |
1350 |
Completed & commissioned in June, 2017. |
PIM |
29 |
Somnath |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
2050 |
2050 |
General Arrangement Drawings (GAD) is approved. Land Owner filed a case in High Court of Gujrat, Ahemdabad to challenge acquisition of land for Railway by State Govt. which is entrusted to RLDA for MFC Development at Somnath. |
PIM |
30 |
Vasai Road |
Mumbai |
WR |
Maharashtra |
22.10.2010 |
1458 |
1458 |
Work started. Due to alignment of metro, lesser Built up Area (BUA) available to compensent additional 525.00 sqm land handed over to lessee. Revised GAD yet to be approved by division. |
PIM |
31 |
Rewa |
Jabalpur |
WCR |
Madhya Pradesh |
22.10.2010 |
5000 |
5000 |
Work almost completed. |
PIM |
32 |
Kurnool Town |
Hyderabad |
SCR |
Andhra Pradesh |
22.10.2010 |
842.8 |
842.8 |
Completed . |
PIM |
33 |
Dhanbad Jn |
Dhanbad |
ECR |
Jharkhand |
22.10.2010 |
1860 |
1860 |
1st/2nd/3rd instalment of lease premium has been received. Lease Agreement yet to be executed |
PIM |
34 |
Asansol |
Asansol |
ER |
West Bengal |
31.05.2010 |
12220 |
4888 |
Work under progress. |
PIM |
35 |
Orai |
Jhansi |
NCR |
Uttar Pradesh |
23.06.2010 |
2000 |
2000 |
Work under progress. |
PIM |
36 |
Dehradun |
Moradabad |
NR |
Uttarakhand |
31.05.2010 |
1881.13 |
1881.13 |
Work in progress. |
PIM |
37 |
Katihar |
Katihar |
NFR |
Bihar |
24.01.2011 |
1025.5 |
1025.5 |
GAD yet to approved by Katihar Division. |
PIM |
38 |
Sambalpur |
Sambalpur |
ECOR |
Orissa |
09.01.2015 |
400 |
384 |
Work in progress. |
PIM |
39 |
Barrackpore |
Sealdah |
ER |
West Bengal |
31.05.2010 |
558 |
558 |
Agreement Executed and site handed over to the developer on 14.02.2019 |
PIM |
40 |
Bolpur |
Howrah |
ER |
West Bengal |
03.01.2013 |
391 |
391 |
Agreement signed on 25.04.2018. Site handed over on 07.06.2018 |
PIM |
41 |
Dibrugarh |
Tinsukia |
NFR |
Assam |
03.01.2013 |
2507 |
500 |
Agreement signed on 10.08.2018.Site handed over to developer. |
PIM |
42 |
Yeshvantpur |
Bangalore |
SWR |
Karnataka |
|
4625 |
2000 |
Work in progress. |
PIM |
43 |
Bhagalpur |
Malda |
ER |
Bihar |
Pending |
920 |
881 |
Agreement executed on 06/12.2018.Site handed over to developer.
GAD yet to be approved by Division. |
PIM |
44 |
Kalyani |
Sealdah |
ER |
West Bengal |
|
1300 |
1300 |
LOA issued on 31.01.2018. 1st, 2nd & 3rd instalment of LP received. |
PIM |
45 |
Hazur Sahib (Nanded) |
Nanded |
SCR |
Maharashtra |
16.06.2010 |
1500 |
1500 |
Lease Agreement signed. Site yet to be handed over to the developer. |
PIM |
46 |
Neemuch |
Ratlam |
WR |
Madhya Pradesh |
20.01.2012 |
1068 |
1068 |
Work in progress. |
PIM |
47 |
Hajipur |
Samastipur |
ECR |
Bihar |
14.05.2012 |
1950 |
1950 |
Lease agreement terminated on request of lessee vide letter dt. 31.08.2020. |
PIM |
48 |
Deoghar |
Asansol |
ER |
West Bengal |
14.05.2012 |
283.5 |
283.5 |
Site handed over to lessee on 28.10.2020 |
PIM
Site Map
|
49 |
Durgapur |
Asansol |
ER |
West Bengal |
31.05.2010 |
10032 |
3010 |
LOA issued on 11.01.2019. LOA cancelled due to Payment default. |
PIM |
50 |
Cuttack |
Khurda Road |
ECOR |
Orissa |
|
2500 |
2500 |
Under Arbitration. Hearing of both side is Completed and Judgment is awaited. |
|
51 |
Kancharapara |
Sealdah |
ER |
West Bengal |
14.05.2012 |
3043 |
3043 |
1st instalment Lease premium received. Previously LOA was cancelled due to payment default and developer has recently approved the Honable High Court, Kolkata. |
PIM |
52 |
Arsikere |
Mysore |
SWR |
Karnataka |
03.01.2013 |
900 |
|
Work in progress. |
|
53 |
Bangarpet |
Bangalore |
SWR |
Karnataka |
03.01.2013 |
1050 |
|
GAD approved. |
|
54 |
Nadiad Jn |
Vadodara |
WR |
Gujrat |
22.10.2010 |
1592 |
1592 |
Lease Agreement signed. Site yet to be handed over to the developer. |
PIM |
OTHER SITES |
|
1 |
Raja-Ki-Mandi |
Agra |
NCR |
Uttar Pradesh |
17.11.2011 |
1529 |
1017 |
LOA issued on 11.01.2019 .LOA cancelled due to Payment default. |
PIM |
2 |
Gorakhpur |
Lucknow |
NER |
Uttar Pradesh |
29.03.2011 |
2410 |
2480 |
Due to Payment default LOA cancelled. Fresh NIT will be invited after valuation. |
PIM |
3 |
Naihati |
Sealdah |
ER |
West Bengal |
14.05.2010 |
520 |
520 |
Due to Payment default LOA cancelled. Fresh NIT will be invited after valuation. |
PIM |
4 |
Sasaram |
Mughal Sarai |
ECR |
Bihar |
04.07.2013 |
2000 |
2000 |
Due to Payment default LOA cancelled. Fresh NIT will be invited after valuation. |
|
5 |
Varanasi |
Lucknow |
NR |
Uttar Pradesh |
Pending |
|
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
6 |
Diamond Harbour |
Sealdah |
ER |
West Bengal |
14.05.2012 |
1287 |
250 |
Due to Payment default, LOA cancelled. Fresh NIT will be invited after valuation. |
PIM |
7 |
Gulbarga |
Sholapur |
CR |
Karnataka |
22.10.2010 |
400 |
400 |
08 times NIT already invited although fresh NIT will be invited. |
PIM |
8 |
Nasik Road |
Bhusaval |
CR |
Maharashtra |
31.05.2010 |
517.95 |
517.95 |
Feasibility of site is being examined being airspace. |
PIM |
9 |
Malda Town |
Malda |
ER |
West Bengal |
17.11.2011 |
1258 |
1258 |
NIT invited & will be opened on 23.06.2021. |
PIM |
10 |
Siuri |
Asansol |
ER |
West Bengal |
20.01.2012 |
1000 |
1000 |
07 times NIT already invited although fresh NIT will be invited. |
PIM |
11 |
Balurghat |
Katihar |
NFR |
West Bengal |
24.01.2011 |
2000 |
250 |
06 times NIT already invited although fresh NIT will be invited. |
PIM |
12 |
Madarihat |
Alipur Duar |
NFR |
West Bengal |
29.03.2011 |
600 |
500 |
06 times NIT already invited although fresh NIT will be invited. |
PIM |
13 |
Rohtak |
Delhi |
NR |
Haryana |
25.02.2013 |
392 |
|
LOA under process. |
PIM |
14 |
Sikar Jn |
Jaipur |
NWR |
Rajasthan |
17.11.2011 |
1064 |
1064 |
NIT invited & will be opened on 23.06.2021. |
PIM |
15 |
Tirchi Fort |
Tiruchhirapalli |
SR |
Tamilnadu |
20.01.2012 |
2350 |
2350 |
NIT invited & will be opened on 23.06.2021. |
PIM |
16 |
Bellary Jn |
Hubli |
SWR |
Karnataka |
20.01.2012 |
4850 |
4850 |
NIT invited & will be opened on 23.06.2021. |
PIM |
17 |
Bharatpur Jn |
Kota |
WCR |
Rajasthan |
03.01.2013 |
750 |
750 |
NIT invited & will be opened on 23.06.2021. |
PIM |
18 |
Bankura |
Adra |
SER |
West Bengal |
15.03.2011 |
5220 |
|
Deferred status withdrawn vide Railway Board letter dated 30.09.2020. Valuation under process. |
PIM |
19 |
Tatanagar |
Chakradharpur |
SER |
Jharkhand |
24.01.2011 |
1168 |
|
LOA under process. |
PIM |
20 |
Bhilai |
Raipur |
SECR |
Chhatisgarh |
17.11.2011 |
800 |
|
Defered status withdrawn vilde Railway Board letter dated 30.09.2020. Valuation under process. |
PIM |
21 |
Chhindwara |
Nagpur |
SECR |
Chhatisgarh |
17.11.2011 |
1085 |
1085 |
Defered by Railway Board vilde letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
22 |
Dhakuria |
Sealdah |
ER |
West Bengal |
14.05.2010 |
372 |
372 |
NIT invited & will be opened on 23.06.2021. |
PIM |
23 |
Jhargram |
Kharagpur |
SER |
West Bengal |
24.01.2011 |
1500 |
|
NIT opened, but no response is received. |
PIM |
24 |
Midnapur |
Kharagpur |
SER |
West Bengal |
Pending |
540 |
|
Deferred status withdrawn vide Railway Board letter dated 30.09.2020. |
|
25 |
Purulia |
Adra |
SER |
West Bengal |
20.01.2012 |
795 |
|
NIT invited & will be opened on 23.06.2021. |
|
26 |
Krishnanagar city Jn. |
Sealdah |
ER |
West Bengal |
31.03.2011 |
875 |
875 |
Site inspection for valuation under process. |
PIM |
27 |
Udhampur |
Firozpur |
NR |
J & K |
29.03.2011 |
2000 |
|
Site inspection required for valuation. |
PIM |
28 |
Patiala |
Ambala |
NR |
Punjab |
15.03.2011 |
1240 |
1240 |
Site inspection required for valuation. |
PIM |
29 |
Srinagar |
Ferozpur |
NR |
J & K |
25.02.2013 |
1500 |
|
Site inspection required for valuation. |
|
30 |
Hisar Jn |
Bikaner |
NWR |
Haryana |
22.10.2010 |
600 |
600 |
Site inspection required for valuation. |
PIM |
31 |
Erode Jn |
Salem |
SR |
Tamilnadu |
22.10.2010 |
3140 |
3140 |
LOA cancelled on 03.01.2018. selected bidder challenge the cancellation of LoA in Madras High Court. After legal advice tender will be invited. |
PIM |
32 |
Brahampur |
Khurda Road |
ECOR |
Orissa |
15.03.2011 |
1000 |
1750 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
33 |
Rayagada |
Sambalpur |
ECOR |
Orissa |
21.08.2014 |
1000 |
1000 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
34 |
Srikakulam Road |
Waltair |
ECOR |
Andhra Pradesh |
21.08.2014 |
1000 |
1000 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
35 |
Vizianagram Jn |
Waltair |
ECOR |
Andhra Pradesh |
15.03.2011 |
1000 |
1830 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
36 |
Ramnagar |
Izzatnagar |
NER |
Uttarkhand |
21.05.2010 |
2800 |
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
37 |
Dimapur |
Lumding |
NFR |
Assam |
24.01.2011 |
2214 |
1850 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
38 |
Agartala |
Lumding |
NFR |
Tripura |
17.11.2011 |
--- |
--- |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
39 |
Panipat |
Delhi |
NR |
Haryana |
25.02.2013 |
600 |
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
40 |
Sonipat |
Delhi |
NR |
Haryana |
15.03.2011 |
551 |
551 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
41 |
Azamgarh |
Varanasi |
NER |
Uttar Pradesh |
Pending |
|
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
42 |
Shimoga Town |
Mysore |
SWR |
Karnataka |
22.10.2010 |
TBD |
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
43 |
New Mal |
Alipur Duar |
NFR |
West Bengal |
29.03.2011 |
2100 |
600 |
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
44 |
Amritsar |
Ferozpur |
NR |
Punjab |
30.01.2013 |
1320 |
|
Under re-development of station. |
|
45 |
Bathinda Cantt. |
Ambala |
NR |
Punjab |
15.03.2011 |
1543 |
|
Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
46 |
Chandigarh * |
Ambala |
NR |
Punjab |
30.01.2013 |
2100 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
47 |
Rajkot |
Rajkot |
WR |
Gujarat |
22.10.2010 |
3570 |
3570 |
Site is deferred by Railway Board. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
48 |
Devangere |
Mysore |
SWR |
Karnataka |
22.10.2010 |
|
|
Site is deferred by Railway Board vide letter dated 14.02.2017. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
49 |
Thiruvananthapuram |
Chennai |
SR |
Tamil Nadu |
17.03.2011 |
|
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
50 |
Mavelikara |
Trivandrum |
SR |
Kerala |
22.10.2010 |
450 |
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
51 |
Nagercoil Jn |
Trivandrum |
SR |
Tamilnadu |
22.10.2010 |
300 |
300 |
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
52 |
Palakkad Jn. |
Palghat |
SR |
Kerala |
07.05.2010 |
303 |
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
53 |
Anara (Adra) |
Adra |
SER |
West Bengal |
02.06.2010 |
9258 |
1000 |
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
54 |
Balasore |
Kharagpur |
SER |
West Bengal |
Pending |
500 |
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
55 |
Jharsuguda Jn |
Chakradharpur |
SER |
Orissa |
15.03.2011 |
1300 |
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
56 |
Ranchi |
Ranchi |
SER |
Chhatisgarh |
07.05.10
22.05.13 |
7500 |
|
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
57 |
Ujjain |
Ratlam |
WR |
Madhya Pradesh |
22.10.2010 |
2000 |
2000 |
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
58 |
Sanchi |
Bhopal |
WCR |
Madhya Pradesh |
22.10.2010 |
4000 |
4000 |
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
59 |
Bhavnagar |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
1037 |
1037 |
Deferred by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
60 |
Ludhiana |
Firozpur |
NR |
Punjab |
15.03.2011 |
1870 |
1870 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
61 |
Jhusi |
Varanasi |
NER |
Uttar Pradesh |
Pending |
1500 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
62 |
Majerhat |
Sealdah |
ER |
West Bengal |
15.03.2011 |
2000 |
2000 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
63 |
Murshidabad |
Sealdah |
ER |
West Bengal |
31.03.2011 |
1350 |
1350 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
64 |
Jamalpur Jn |
Malda |
ER |
West Bengal |
14.05.2012 |
390 |
390 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
65 |
Nabadwipdham |
Howrah |
ER |
West Bengal |
17.11.2011 |
1025 |
1025 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
66 |
New Farakka |
Malda |
ER |
West Bengal |
17.11.2011 |
1507 |
1507 |
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
PIM |
67 |
Thakurnagar |
Howrah |
ER |
West Bengal |
|
|
|
Differed by Railway Board vide letter dated 14.02.2017.Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
68 |
Vishakhapatnam |
Waltair |
ECOR |
Andhra Pradesh |
Pending |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
69 |
Bhubaneswar |
Bhubaneswar |
ECOR |
Orissa |
Pending |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdraw the site vide letter dt.11.03.2021. |
|
Total Sites - 123
|