Sn. |
Site |
Division |
Zone |
State |
Date of Entrustment |
Area Entrusted in sqm |
Area Proposed to be Utilized in sqm |
Status |
PIM |
1 |
Lokmanya Tilak Terminus |
Mumbai |
CR |
Maharashtra |
22.10.2010 |
1500 |
1500 |
Developer Fixed |
PIM |
2 |
Miraj Jn |
Pune |
CR |
Maharashtra |
22.10.2010 |
7125 |
7125 |
Developer Fixed |
|
3 |
Shegaon |
Bhusaval |
CR |
Maharashtra |
22.10.2010 |
1500 |
1500 |
Developer Fixed |
PIM |
4 |
Wardha |
Nagpur |
CR |
Maharashtra |
22.10.2010 |
1255 |
1255 |
Developer Fixed |
PIM |
5 |
Gaya |
Mughal Sarai |
ECR |
Bihar |
17.03.2011 |
2000 |
2000 |
Awarded |
PIM |
6 |
Patna Saheb |
Danapur |
ECR |
Bihar |
22.10.2010 |
4365 |
4365 |
Awarded |
PIM |
7 |
Raxaul Jn |
Samastipur |
ECR |
Bihar |
22.10.2010 |
2000 |
2000 |
Awarded |
PIM |
8 |
Jhansi |
Jhansi |
NCR |
Uttar Pradesh |
22.10.2011 |
2000 |
2000 |
Developer Fixed |
|
9 |
Katra |
Firozpur |
NR |
J & K |
|
9700 |
4500 |
Developer Fixed |
|
10 |
Bareilly |
Moradabad |
NR |
Uttar Pradesh |
15.03.2011 |
1078 |
841.35 |
Developer Fixed |
PIM |
11 |
Abu Road |
Ajmer |
NWR |
Rajasthan |
17.11.2011 |
924 |
924 |
Developer Fixed |
PIM |
12 |
Ajmer* |
Ajmer |
NWR |
Rajasthan |
20.01.2012 |
1302 |
1302 |
Developer Fixed |
PIM |
13 |
Dhrmavaram (near Puttaparthi)* |
Guntakal |
SCR |
Andhra Pradesh |
22.10.2010 |
1080 |
1080 |
Developer Fixed |
PIM |
14 |
Kacheguda |
Hyderabad |
SCR |
Telangana |
03.01.2013 |
1008 |
1008 |
Developer Fixed |
|
15 |
Karimnagar |
Secundrabad |
SCR |
Telangana |
22.10.2010 |
1650 |
1650 |
Developer Fixed |
PIM |
|
|
|
|
|
|
|
|
|
|
16 |
Nellore |
Vijayawada |
SCR |
Andhra Pradesh |
22.10.2010 |
450 |
450 |
Awarded |
PIM |
17 |
Nizamabad |
Hyderabad |
SCR |
Telangana |
22.10.2010 |
3750 |
3750 |
Developer Fixed |
PIM |
18 |
Vijayawada |
Vijayawada |
SCR |
Andhra Pradesh |
22.10.2010 |
1857 |
1857 |
Awarded |
PIM |
19 |
Zahirabad (Medak) |
Secundrabad |
SCR |
Telangana |
22.10.2010 |
1606 |
1606 |
Developer Fixed |
PIM |
20 |
Kasaragod |
Palghat |
SR |
Kerala |
15.03.2011 |
990 |
990 |
Developer Fixed |
PIM |
21 |
Salem |
Salem |
SR |
Tamilnadu |
22.10.2010 |
975 |
975 |
Developer Fixed |
PIM |
22 |
Tiruttani |
Chennai |
SR |
Tamilnadu |
22.10.2010 |
210 |
210 |
Developer Fixed |
PIM |
23 |
Tumkur |
Bangalore |
SWR |
Karnataka |
20.01.2012 |
1593 |
1593 |
Developer Fixed |
PIM |
24 |
Sawai-Madhopur Jn |
Kota |
WCR |
Rajasthan |
15.03.2011 |
5000 |
5000 |
Developer Fixed |
PIM |
25 |
Anand |
Vadodara |
WR |
Gujarat |
17.03.2011 |
1500 |
1500 |
Developer Fixed |
PIM |
26 |
Bhuj |
Ahmedabad |
WR |
Gujarat |
17.03.2011 |
1080 |
1080 |
Developer Fixed |
PIM |
27 |
Junagadh Jn. |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
1575 |
1575 |
Developer Fixed |
PIM |
28 |
Ratlam |
Ratlam |
WR |
Madhya Pradesh |
14.05.2012 |
1350 |
1350 |
Developer Fixed |
PIM |
29 |
Somnath |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
2050 |
2050 |
Developer Fixed |
PIM |
30 |
Vasai Road |
Mumbai |
WR |
Maharashtra |
22.10.2010 |
1458 |
1458 |
Developer Fixed |
PIM |
31 |
Rewa |
Jabalpur |
WCR |
Madhya Pradesh |
22.10.2010 |
5000 |
5000 |
Developer Fixed |
PIM |
32 |
Kurnool Town |
Hyderabad |
SCR |
Andhra Pradesh |
22.10.2010 |
842.8 |
842.8 |
Awarded |
PIM |
33 |
Dhanbad Jn |
Dhanbad |
ECR |
Jharkhand |
22.10.2010 |
1860 |
1860 |
LOA cancelled due to non availability of Land |
PIM |
34 |
Asansol |
Asansol |
ER |
West Bengal |
31.05.2010 |
12220 |
4888 |
Developer Fixed |
PIM |
35 |
Orai |
Jhansi |
NCR |
Uttar Pradesh |
23.06.2010 |
2000 |
2000 |
Developer Fixed |
PIM |
36 |
Dehradun |
Moradabad |
NR |
Uttarakhand |
31.05.2010 |
1881.13 |
1881.13 |
Developer Fixed |
PIM |
37 |
Katihar |
Katihar |
NFR |
Bihar |
24.01.2011 |
1025.5 |
1025.5 |
Developer Fixed |
PIM |
38 |
Sambalpur |
Sambalpur |
ECOR |
Orissa |
09.01.2015 |
400 |
384 |
Developer Fixed |
PIM |
39 |
Barrackpore |
Sealdah |
ER |
West Bengal |
31.05.2010 |
558 |
558 |
Developer Fixed |
PIM |
40 |
Bolpur |
Howrah |
ER |
West Bengal |
03.01.2013 |
391 |
391 |
Developer Fixed |
PIM |
41 |
Dibrugarh |
Tinsukia |
NFR |
Assam |
03.01.2013 |
2507 |
500 |
Awarded |
PIM |
42 |
Yeshvantpur |
Bangalore |
SWR |
Karnataka |
|
4625 |
2000 |
Developer Fixed |
PIM |
43 |
Bhagalpur |
Malda |
ER |
Bihar |
17.03.2011 |
920 |
881 |
Awarded |
PIM |
44 |
Kalyani |
Sealdah |
ER |
West Bengal |
|
1300 |
1300 |
Developer Fixed |
PIM |
45 |
Hazur Sahib (Nanded) |
Nanded |
SCR |
Maharashtra |
16.06.2010 |
1500 |
1500 |
Developer Fixed |
PIM |
46 |
Neemuch |
Ratlam |
WR |
Madhya Pradesh |
20.01.2012 |
1068 |
1068 |
Developer Fixed |
PIM |
47 |
Hajipur |
Samastipur |
ECR |
Bihar |
14.05.2012 |
1950 |
1950 |
Court Case |
PIM |
48 |
Deoghar |
Asansol |
ER |
West Bengal |
14.05.2012 |
283.5 |
283.5 |
Developer Fixed |
PIM
Site Map
|
49 |
Durgapur |
Asansol |
ER |
West Bengal |
31.05.2010 |
10032 |
3010 |
Developer Fixed |
PIM |
50 |
Cuttack |
Khurda Road |
ECOR |
Orissa |
|
2500 |
2500 |
Court Case |
|
51 |
Kancharapara |
Sealdah |
ER |
West Bengal |
14.05.2012 |
3043 |
3043 |
Developer Fixed |
PIM |
52 |
Arsikere |
Mysore |
SWR |
Karnataka |
03.01.2013 |
900 |
900 |
Developer Fixed |
|
53 |
Bangarpet |
Bangalore |
SWR |
Karnataka |
03.01.2013 |
1050 |
1050 |
Developer Fixed |
|
54 |
Nadiad Jn |
Vadodara |
WR |
Gujrat |
22.10.2010 |
1592 |
1592 |
Developer Fixed |
PIM |
55 |
Raja-Ki-Mandi |
Agra |
NCR |
Uttar Pradesh |
17.11.2011 |
1529 |
1017 |
Developer Fixed |
PIM |
56 |
Gorakhpur |
Lucknow |
NER |
Uttar Pradesh |
29.03.2011 |
2410 |
2480 |
Upcoming |
PIM |
57 |
Naihati |
Sealdah |
ER |
West Bengal |
14.05.2010 |
520 |
520 |
Upcoming in 3 months |
PIM |
58 |
Sasaram |
Mughal Sarai |
ECR |
Bihar |
04.07.2013 |
2000 |
2000 |
Awarded |
|
59 |
Varanasi |
Lucknow |
NR |
Uttar Pradesh |
Pending |
|
|
Alternate site required |
|
60 |
Diamond Harbour |
Sealdah |
ER |
West Bengal |
14.05.2012 |
1287 |
250 |
Upcoming in 3 months |
PIM |
61 |
Gulbarga |
Sholapur |
CR |
Karnataka |
22.10.2010 |
400 |
400 |
Upcoming |
PIM |
62 |
Nasik Road |
Bhusaval |
CR |
Maharashtra |
31.05.2010 |
517.95 |
517.95 |
Under Study |
PIM |
63 |
Malda Town |
Malda |
ER |
West Bengal |
17.11.2011 |
1258 |
1258 |
Upcoming |
PIM |
64 |
Siuri |
Asansol |
ER |
West Bengal |
20.01.2012 |
1000 |
1000 |
Upcoming |
PIM |
65 |
Balurghat |
Katihar |
NFR |
West Bengal |
24.01.2011 |
2000 |
250 |
Upcoming |
PIM |
66 |
Madarihat |
Alipur Duar |
NFR |
West Bengal |
29.03.2011 |
600 |
500 |
Upcoming |
PIM |
67 |
Rohtak |
Delhi |
NR |
Haryana |
25.02.2013 |
392 |
357 |
Developer Fixed |
PIM |
68 |
Sikar Jn |
Jaipur |
NWR |
Rajasthan |
17.11.2011 |
1064 |
1064 |
Developer Fixed |
PIM |
69 |
Tirchi Fort |
Tiruchhirapalli |
SR |
Tamilnadu |
20.01.2012 |
2350 |
2350 |
Upcoming |
PIM |
70 |
Bellary Jn |
Hubli |
SWR |
Karnataka |
20.01.2012 |
4850 |
4850 |
Upcoming |
PIM |
71 |
Bharatpur Jn |
Kota |
WCR |
Rajasthan |
03.01.2013 |
750 |
750 |
Upcoming |
PIM |
72 |
Bankura |
Adra |
SER |
West Bengal |
15.03.2011 |
5220 |
|
Upcoming in 3 months |
PIM |
73 |
Tatanagar |
Chakradharpur |
SER |
Jharkhand |
24.01.2011 |
1168 |
|
Developer Fixed |
PIM |
74 |
Bhilai |
Raipur |
SECR |
Chhatisgarh |
17.11.2011 |
800 |
|
Upcoming in 3 months |
PIM |
75 |
Chhindwara |
Nagpur |
SECR |
Chhatisgarh |
17.11.2011 |
1085 |
1085 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
76 |
Dhakuria |
Sealdah |
ER |
West Bengal |
14.05.2010 |
372 |
372 |
Upcoming |
PIM |
77 |
Jhargram |
Kharagpur |
SER |
West Bengal |
24.01.2011 |
1500 |
|
Upcoming |
PIM |
78 |
Midnapur |
Kharagpur |
SER |
West Bengal |
Pending |
540 |
|
Upcoming in 3 months |
|
79 |
Purulia |
Adra |
SER |
West Bengal |
20.01.2012 |
795 |
|
Developer Fixed |
|
80 |
Krishnanagar city Jn. |
Sealdah |
ER |
West Bengal |
31.03.2011 |
875 |
875 |
Upcoming in 3 months |
PIM |
81 |
Udhampur |
Firozpur |
NR |
J & K |
29.03.2011 |
2000 |
|
Upcoming in 3 months |
PIM |
82 |
Patiala |
Ambala |
NR |
Punjab |
15.03.2011 |
1240 |
1240 |
Upcoming in 3 months |
PIM |
83 |
Srinagar |
Ferozpur |
NR |
J & K |
25.02.2013 |
1500 |
|
Upcoming in 3 months |
|
84 |
Hisar Jn |
Bikaner |
NWR |
Haryana |
22.10.2010 |
600 |
600 |
Upcoming in 3 months |
PIM |
85 |
Erode Jn |
Salem |
SR |
Tamilnadu |
22.10.2010 |
3140 |
3140 |
Upcoming |
PIM |
86 |
Brahampur |
Khurda Road |
ECOR |
Orissa |
15.03.2011 |
1000 |
1750 |
Alternate site required |
PIM |
87 |
Rayagada |
Sambalpur |
ECOR |
Orissa |
21.08.2014 |
1000 |
1000 |
Alternate site required |
|
88 |
Srikakulam Road |
Waltair |
ECOR |
Andhra Pradesh |
21.08.2014 |
1000 |
1000 |
Alternate site required |
|
89 |
Vizianagram Jn |
Waltair |
ECOR |
Andhra Pradesh |
15.03.2011 |
1000 |
1830 |
Alternate site required |
PIM |
90 |
Ramnagar |
Izzatnagar |
NER |
Uttarkhand |
21.05.2010 |
2800 |
|
Alternate site required |
PIM |
91 |
Dimapur |
Lumding |
NFR |
Assam |
24.01.2011 |
2214 |
1850 |
Alternate site required |
PIM |
92 |
Agartala |
Lumding |
NFR |
Tripura |
17.11.2011 |
--- |
--- |
Alternate site required |
PIM |
93 |
Panipat |
Delhi |
NR |
Haryana |
25.02.2013 |
600 |
|
Alternate site required |
|
94 |
Sonipat |
Delhi |
NR |
Haryana |
15.03.2011 |
551 |
551 |
Alternate site required |
|
95 |
Azamgarh |
Varanasi |
NER |
Uttar Pradesh |
Pending |
|
|
Proposed for de-entrustment |
|
96 |
Shimoga Town |
Mysore |
SWR |
Karnataka |
22.10.2010 |
TBD |
TBD |
Alternate site required |
|
97 |
New Mal |
Alipur Duar |
NFR |
West Bengal |
29.03.2011 |
2100 |
600 |
Proposed for De-entrustment |
PIM |
98 |
Amritsar |
Ferozpur |
NR |
Punjab |
30.01.2013 |
1320 |
|
Under re-development of station. |
|
99 |
Bathinda Cantt. |
Ambala |
NR |
Punjab |
15.03.2011 |
1543 |
|
Proposed for De-entrustment |
PIM |
100 |
Chandigarh * |
Ambala |
NR |
Punjab |
30.01.2013 |
2100 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
101 |
Rajkot |
Rajkot |
WR |
Gujarat |
22.10.2010 |
3570 |
3570 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
102 |
Devangere |
Mysore |
SWR |
Karnataka |
22.10.2010 |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
103 |
Thiruvananthapuram |
Chennai |
SR |
Tamil Nadu |
17.03.2011 |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
104 |
Mavelikara |
Trivandrum |
SR |
Kerala |
22.10.2010 |
450 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
105 |
Nagercoil Jn |
Trivandrum |
SR |
Tamilnadu |
22.10.2010 |
300 |
300 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
106 |
Palakkad Jn. |
Palghat |
SR |
Kerala |
07.05.2010 |
303 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
107 |
Anara (Adra) |
Adra |
SER |
West Bengal |
02.06.2010 |
9258 |
1000 |
Proposed for de-entrustment |
PIM |
108 |
Balasore |
Kharagpur |
SER |
West Bengal |
Pending |
500 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
109 |
Jharsuguda Jn |
Chakradharpur |
SER |
Orissa |
15.03.2011 |
1300 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
110 |
Ranchi |
Ranchi |
SER |
Chhatisgarh |
07.05.10
22.05.13
|
7500 |
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
111 |
Ujjain |
Ratlam |
WR |
Madhya Pradesh |
22.10.2010 |
2000 |
2000 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
112 |
Sanchi |
Bhopal |
WCR |
Madhya Pradesh |
22.10.2010 |
4000 |
4000 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
113 |
Bhavnagar |
Bhavnagar |
WR |
Gujrat |
22.10.2010 |
1037 |
1037 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
114 |
Ludhiana |
Firozpur |
NR |
Punjab |
15.03.2011 |
1870 |
1870 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
115 |
Jhusi |
Varanasi |
NER |
Uttar Pradesh |
Pending |
1500 |
|
Court Case |
|
116 |
Majerhat |
Sealdah |
ER |
West Bengal |
15.03.2011 |
2000 |
2000 |
Proposed for de-entrustment |
PIM |
117 |
Murshidabad |
Sealdah |
ER |
West Bengal |
31.03.2011 |
1350 |
1350 |
Proposed for de-entrustment |
PIM |
118 |
Jamalpur Jn |
Malda |
ER |
West Bengal |
14.05.2012 |
390 |
390 |
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
PIM |
119 |
Nabadwipdham |
Howrah |
ER |
West Bengal |
17.11.2011 |
1025 |
1025 |
Proposed for De-entrustment |
PIM |
120 |
New Farakka |
Malda |
ER |
West Bengal |
17.11.2011 |
1507 |
1507 |
Proposed for de-entrustment |
PIM |
121 |
Thakurnagar |
Howrah |
ER |
West Bengal |
|
|
|
Proposed for de-entrustment |
|
122 |
Vishakhapatnam |
Waltair |
ECOR |
Andhra Pradesh |
Pending |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|
123 |
Bhubaneswar |
Bhubaneswar |
ECOR |
Orissa |
Pending |
|
|
Site is deferred by Railway Board. Railway Board has been requested to withdrawal the site from RLDA and return to concern railway zone |
|